Thursday 5 November 2009

Additional filming

After we submitted our roughcut it was clear that there were some large portions of footage missing. We plan to fill most of these gaps with the band singing and performing the chorus of the song. We will also include more shot variety (close ups, long shots etc) as up to now we have only really been using medium shots.

Extreme Close Up:



Close Up:

Long Shot:




No response to “Additional filming”

Leave a reply

 
© 2009 GROUP 43 - Music Video 2009/10. All Rights Reserved | Powered by Blogger
Design by psdvibe | Bloggerized By LawnyDesignz